{"id":1260,"date":"2016-10-09T14:24:19","date_gmt":"2016-10-09T14:24:19","guid":{"rendered":"https:\/\/sivandesign.com\/new2016\/?page_id=1260"},"modified":"2016-12-12T06:51:55","modified_gmt":"2016-12-12T06:51:55","slug":"world-bank-rims-kaduna","status":"publish","type":"page","link":"https:\/\/sivandesign.com\/company\/global-projects\/world-bank-rims-kaduna\/","title":{"rendered":"World Bank RIMS &#8211; Kaduna"},"content":{"rendered":"<h1>Kaduna\u00a0World Bank Road Information Management System<\/h1>\n<p><strong>Project Name<\/strong>: Consultancy Services For Preparation\u00a0Of Road Information Management System In Kaduna State<br \/>\n<strong>Client<\/strong>: World Bank, RAMP, SPIU<br \/>\n<strong>Country<\/strong>: Nigeria,\u00a0Kaduna State<\/p>\n<hr \/>\n<p>The project includes video survey and wind shield (ROW) survey of distress, IRI data was collected, inventory survey (roads, bridges, and assets).\u00a0Sivan Design in association with\u00a0MNM developed a RIMS (Road Information Management System) module for the state of Kaduna: Methodology (engineering and economic), software. It includes a PMS\/BMS module (data tables, software architecture, models-traffic, deterioration, decision tree, economic etc.). After surveys finished we import the data into the PMS\/BMS modules, analyzed the collected data of the network, and create work plans.<\/p>\n<p>&nbsp;<\/p>\n<h3>Description of the services provided<\/h3>\n<p>The project included many activities and services all of which were provided by Sivan Design:<\/p>\n<ul>\n<li><strong>Developing <\/strong>the road data bank (RDB) for the RDP pilot State roads.<\/li>\n<li><strong>Pavement <\/strong>management system (PMS) implementation.<\/li>\n<li><strong>Bridge Management System (BMS) <\/strong>implementation for prioritizing maintenance actions using engineering-economic criteria and development of local road strategy for the next 5 years.<\/li>\n<li><strong>State level surveys <\/strong>management and QA.<\/li>\n<li><strong>Data collected: <\/strong>traffic data, IRI, Rut, FWD-Deflections, distress analysis-PAVER, geometry, GPS, Land use data<\/li>\n<li><strong>Analysis <\/strong>of collected road network data<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"wp-image-1263 size-full aligncenter\" src=\"https:\/\/sivandesign.com\/wp-content\/uploads\/2016\/10\/world_bank_rims_kaduna_3.jpg\" alt=\"world_bank_rims_kaduna_3\" width=\"864\" height=\"504\" srcset=\"https:\/\/sivandesign.com\/wp-content\/uploads\/2016\/10\/world_bank_rims_kaduna_3.jpg 864w, https:\/\/sivandesign.com\/wp-content\/uploads\/2016\/10\/world_bank_rims_kaduna_3-600x350.jpg 600w, https:\/\/sivandesign.com\/wp-content\/uploads\/2016\/10\/world_bank_rims_kaduna_3-300x175.jpg 300w, https:\/\/sivandesign.com\/wp-content\/uploads\/2016\/10\/world_bank_rims_kaduna_3-768x448.jpg 768w\" sizes=\"(max-width: 864px) 100vw, 864px\" \/><\/p>\n<p><img decoding=\"async\" class=\"wp-image-1261 size-full aligncenter\" src=\"https:\/\/sivandesign.com\/wp-content\/uploads\/2016\/10\/world_bank_rims_kaduna_1.jpg\" alt=\"world_bank_rims_kaduna_1\" width=\"864\" height=\"504\" srcset=\"https:\/\/sivandesign.com\/wp-content\/uploads\/2016\/10\/world_bank_rims_kaduna_1.jpg 864w, https:\/\/sivandesign.com\/wp-content\/uploads\/2016\/10\/world_bank_rims_kaduna_1-600x350.jpg 600w, https:\/\/sivandesign.com\/wp-content\/uploads\/2016\/10\/world_bank_rims_kaduna_1-300x175.jpg 300w, https:\/\/sivandesign.com\/wp-content\/uploads\/2016\/10\/world_bank_rims_kaduna_1-768x448.jpg 768w\" sizes=\"(max-width: 864px) 100vw, 864px\" \/><\/p>\n<h5 style=\"text-align: center;\">\u00a0\u00a0Star Point \/ Work in Progress<\/h5>\n<p>&nbsp;<\/p>\n<p><img decoding=\"async\" class=\"alignnone wp-image-1262 size-full\" src=\"https:\/\/sivandesign.com\/wp-content\/uploads\/2016\/10\/world_bank_rims_kaduna_2.jpg\" alt=\"world_bank_rims_kaduna_2\" width=\"864\" height=\"504\" srcset=\"https:\/\/sivandesign.com\/wp-content\/uploads\/2016\/10\/world_bank_rims_kaduna_2.jpg 864w, https:\/\/sivandesign.com\/wp-content\/uploads\/2016\/10\/world_bank_rims_kaduna_2-600x350.jpg 600w, https:\/\/sivandesign.com\/wp-content\/uploads\/2016\/10\/world_bank_rims_kaduna_2-300x175.jpg 300w, https:\/\/sivandesign.com\/wp-content\/uploads\/2016\/10\/world_bank_rims_kaduna_2-768x448.jpg 768w\" sizes=\"(max-width: 864px) 100vw, 864px\" \/><\/p>\n<h5 style=\"text-align: center;\">\u00a0Road Survey Equipment<\/h5>\n<p>&nbsp;<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-1264 size-full aligncenter\" src=\"https:\/\/sivandesign.com\/wp-content\/uploads\/2016\/10\/world_bank_rims_kaduna_4.jpg\" alt=\"world_bank_rims_kaduna_4\" width=\"864\" height=\"504\" srcset=\"https:\/\/sivandesign.com\/wp-content\/uploads\/2016\/10\/world_bank_rims_kaduna_4.jpg 864w, https:\/\/sivandesign.com\/wp-content\/uploads\/2016\/10\/world_bank_rims_kaduna_4-600x350.jpg 600w, https:\/\/sivandesign.com\/wp-content\/uploads\/2016\/10\/world_bank_rims_kaduna_4-300x175.jpg 300w, https:\/\/sivandesign.com\/wp-content\/uploads\/2016\/10\/world_bank_rims_kaduna_4-768x448.jpg 768w\" sizes=\"(max-width: 864px) 100vw, 864px\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-1265 size-full aligncenter\" src=\"https:\/\/sivandesign.com\/wp-content\/uploads\/2016\/10\/world_bank_rims_kaduna_5.jpg\" alt=\"world_bank_rims_kaduna_5\" width=\"864\" height=\"504\" srcset=\"https:\/\/sivandesign.com\/wp-content\/uploads\/2016\/10\/world_bank_rims_kaduna_5.jpg 864w, https:\/\/sivandesign.com\/wp-content\/uploads\/2016\/10\/world_bank_rims_kaduna_5-600x350.jpg 600w, https:\/\/sivandesign.com\/wp-content\/uploads\/2016\/10\/world_bank_rims_kaduna_5-300x175.jpg 300w, https:\/\/sivandesign.com\/wp-content\/uploads\/2016\/10\/world_bank_rims_kaduna_5-768x448.jpg 768w\" sizes=\"(max-width: 864px) 100vw, 864px\" \/><\/p>\n<h5 style=\"text-align: center;\">\u00a0Typical Distress analysis station with 2 LCD screens<\/h5>\n<p>&nbsp;<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-1266 size-full aligncenter\" src=\"https:\/\/sivandesign.com\/wp-content\/uploads\/2016\/10\/world_bank_rims_kaduna_6.jpg\" alt=\"world_bank_rims_kaduna_6\" width=\"864\" height=\"504\" srcset=\"https:\/\/sivandesign.com\/wp-content\/uploads\/2016\/10\/world_bank_rims_kaduna_6.jpg 864w, https:\/\/sivandesign.com\/wp-content\/uploads\/2016\/10\/world_bank_rims_kaduna_6-600x350.jpg 600w, https:\/\/sivandesign.com\/wp-content\/uploads\/2016\/10\/world_bank_rims_kaduna_6-300x175.jpg 300w, https:\/\/sivandesign.com\/wp-content\/uploads\/2016\/10\/world_bank_rims_kaduna_6-768x448.jpg 768w\" sizes=\"(max-width: 864px) 100vw, 864px\" \/><\/p>\n<h5 style=\"text-align: center;\">\u00a0Floating distress survey data form over GIS (one screen configuration)<\/h5>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Kaduna\u00a0World Bank Road Information Management System Project Name: Consultancy Services For Preparation\u00a0Of Road Information Management System In Kaduna State Client: World Bank, RAMP, SPIU Country: Nigeria,\u00a0Kaduna State The project includes video survey and wind shield (ROW) survey of distress, IRI data was collected, inventory survey (roads, bridges, and assets).\u00a0Sivan Design in association with\u00a0MNM developed a [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":109,"menu_order":20,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"_joinchat":[],"footnotes":"","_links_to":"","_links_to_target":""},"class_list":["post-1260","page","type-page","status-publish","hentry","post"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v24.9 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>World Bank RIMS - Kaduna - Sivan Design<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/sivandesign.com\/company\/global-projects\/world-bank-rims-kaduna\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"World Bank RIMS - Kaduna - Sivan Design\" \/>\n<meta property=\"og:description\" content=\"Kaduna\u00a0World Bank Road Information Management System Project Name: Consultancy Services For Preparation\u00a0Of Road Information Management System In Kaduna State Client: World Bank, RAMP, SPIU Country: Nigeria,\u00a0Kaduna State The project includes video survey and wind shield (ROW) survey of distress, IRI data was collected, inventory survey (roads, bridges, and assets).\u00a0Sivan Design in association with\u00a0MNM developed a [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/sivandesign.com\/company\/global-projects\/world-bank-rims-kaduna\/\" \/>\n<meta property=\"og:site_name\" content=\"Sivan Design\" \/>\n<meta property=\"article:modified_time\" content=\"2016-12-12T06:51:55+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/sivandesign.com\/wp-content\/uploads\/2016\/10\/world_bank_rims_kaduna_3.jpg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/sivandesign.com\/company\/global-projects\/world-bank-rims-kaduna\/\",\"url\":\"https:\/\/sivandesign.com\/company\/global-projects\/world-bank-rims-kaduna\/\",\"name\":\"World Bank RIMS - Kaduna - Sivan Design\",\"isPartOf\":{\"@id\":\"https:\/\/sivandesign.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/sivandesign.com\/company\/global-projects\/world-bank-rims-kaduna\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/sivandesign.com\/company\/global-projects\/world-bank-rims-kaduna\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/sivandesign.com\/wp-content\/uploads\/2016\/10\/world_bank_rims_kaduna_3.jpg\",\"datePublished\":\"2016-10-09T14:24:19+00:00\",\"dateModified\":\"2016-12-12T06:51:55+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/sivandesign.com\/company\/global-projects\/world-bank-rims-kaduna\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/sivandesign.com\/company\/global-projects\/world-bank-rims-kaduna\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/sivandesign.com\/company\/global-projects\/world-bank-rims-kaduna\/#primaryimage\",\"url\":\"https:\/\/sivandesign.com\/wp-content\/uploads\/2016\/10\/world_bank_rims_kaduna_3.jpg\",\"contentUrl\":\"https:\/\/sivandesign.com\/wp-content\/uploads\/2016\/10\/world_bank_rims_kaduna_3.jpg\",\"width\":864,\"height\":504},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/sivandesign.com\/company\/global-projects\/world-bank-rims-kaduna\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/sivandesign.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Our Company\",\"item\":\"https:\/\/sivandesign.com\/company\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Success Stories\",\"item\":\"https:\/\/sivandesign.com\/company\/global-projects\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"World Bank RIMS &#8211; Kaduna\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/sivandesign.com\/#website\",\"url\":\"https:\/\/sivandesign.com\/\",\"name\":\"Sivan Design\",\"description\":\"Geospatial Solutions | GIS Capabilities | Land &amp; Infrastructure Management | 3D GIS | Civil Engineering\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/sivandesign.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"World Bank RIMS - Kaduna - Sivan Design","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/sivandesign.com\/company\/global-projects\/world-bank-rims-kaduna\/","og_locale":"en_US","og_type":"article","og_title":"World Bank RIMS - Kaduna - Sivan Design","og_description":"Kaduna\u00a0World Bank Road Information Management System Project Name: Consultancy Services For Preparation\u00a0Of Road Information Management System In Kaduna State Client: World Bank, RAMP, SPIU Country: Nigeria,\u00a0Kaduna State The project includes video survey and wind shield (ROW) survey of distress, IRI data was collected, inventory survey (roads, bridges, and assets).\u00a0Sivan Design in association with\u00a0MNM developed a [&hellip;]","og_url":"https:\/\/sivandesign.com\/company\/global-projects\/world-bank-rims-kaduna\/","og_site_name":"Sivan Design","article_modified_time":"2016-12-12T06:51:55+00:00","og_image":[{"url":"https:\/\/sivandesign.com\/wp-content\/uploads\/2016\/10\/world_bank_rims_kaduna_3.jpg","type":"","width":"","height":""}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/sivandesign.com\/company\/global-projects\/world-bank-rims-kaduna\/","url":"https:\/\/sivandesign.com\/company\/global-projects\/world-bank-rims-kaduna\/","name":"World Bank RIMS - Kaduna - Sivan Design","isPartOf":{"@id":"https:\/\/sivandesign.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/sivandesign.com\/company\/global-projects\/world-bank-rims-kaduna\/#primaryimage"},"image":{"@id":"https:\/\/sivandesign.com\/company\/global-projects\/world-bank-rims-kaduna\/#primaryimage"},"thumbnailUrl":"https:\/\/sivandesign.com\/wp-content\/uploads\/2016\/10\/world_bank_rims_kaduna_3.jpg","datePublished":"2016-10-09T14:24:19+00:00","dateModified":"2016-12-12T06:51:55+00:00","breadcrumb":{"@id":"https:\/\/sivandesign.com\/company\/global-projects\/world-bank-rims-kaduna\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/sivandesign.com\/company\/global-projects\/world-bank-rims-kaduna\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/sivandesign.com\/company\/global-projects\/world-bank-rims-kaduna\/#primaryimage","url":"https:\/\/sivandesign.com\/wp-content\/uploads\/2016\/10\/world_bank_rims_kaduna_3.jpg","contentUrl":"https:\/\/sivandesign.com\/wp-content\/uploads\/2016\/10\/world_bank_rims_kaduna_3.jpg","width":864,"height":504},{"@type":"BreadcrumbList","@id":"https:\/\/sivandesign.com\/company\/global-projects\/world-bank-rims-kaduna\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/sivandesign.com\/"},{"@type":"ListItem","position":2,"name":"Our Company","item":"https:\/\/sivandesign.com\/company\/"},{"@type":"ListItem","position":3,"name":"Success Stories","item":"https:\/\/sivandesign.com\/company\/global-projects\/"},{"@type":"ListItem","position":4,"name":"World Bank RIMS &#8211; Kaduna"}]},{"@type":"WebSite","@id":"https:\/\/sivandesign.com\/#website","url":"https:\/\/sivandesign.com\/","name":"Sivan Design","description":"Geospatial Solutions | GIS Capabilities | Land &amp; Infrastructure Management | 3D GIS | Civil Engineering","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/sivandesign.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/sivandesign.com\/wp-json\/wp\/v2\/pages\/1260","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sivandesign.com\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/sivandesign.com\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/sivandesign.com\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sivandesign.com\/wp-json\/wp\/v2\/comments?post=1260"}],"version-history":[{"count":0,"href":"https:\/\/sivandesign.com\/wp-json\/wp\/v2\/pages\/1260\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/sivandesign.com\/wp-json\/wp\/v2\/pages\/109"}],"wp:attachment":[{"href":"https:\/\/sivandesign.com\/wp-json\/wp\/v2\/media?parent=1260"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}